August 2021 Meeting Minutes

2021 August Monthly Meeting

Date: 25/08/21 7:09PM

Location: GTH Financial

Attendees: David Warner (DW), Cameron Carlile (CC), Matt McColley (MM), Damien Cann (DC), Mani Agrotis (MA), Waide Brennan (WB), Gillian Chesterfield (GC), Tony White (TW)

Apologies: Niall Ryan

Minutes:

Declared open by DC at 7:09pm

No conflicts of interest noted. Previous minutes declared true and correct by CC.

Club health - 215 Members

Financial Health - $31 000

Presidents report: (DW)

All members Emails are now organised through AusCycling, with the supporters memberships being manually entered into Tidy HQ. The maintenance training workshops are being organised in conjunction with TRC, with funding through a grant application with AusCycling. The shipping container is now located at the grassy knoll and should provide much easier access to trail maintenance equipment.

Kind Regards David Warner

June Action items

The North Face (NF)

MM - Google form to send donors

Form will have options for each donor - refund/leave in club funds etc.

GG suggested that the form should have information regarding what the club has achieved over the last 3 months, and what the club is intending to achieve over the next 3 months.

Look into tax deductible nature of the donations

MM to build and distribute form

Online Petition Update

Discuss at September meeting

July Items and New Business

Trail and Signage Audit

DW requested that all members keep an eye out for any signage that may be missing, or in need of repair.

UPDATE

Centrelink Up - Signage required at the split to Centrelink / Giblets.

CC to make up a mini map with new changes.

Signage required at jumple at crows flight/centrelink/canyonero area.

possible issue with canyonero centrelink and crows flight centrelink converging.

Removal of logs on Centrelink to morph it into a green climb trail?

possible ride around option so that logs can remain and its flowy for beginner riders

Daniel from TRC requested a copy of the design of the Cheeseburger/ Fries changes

TRC requests a B line on the Hyperlink creek - this will provide another viable green loop on the upper trails.

New Run of Merchandise

Socks $18 a pair (minimum order of 40 - local printer)

Can’t do logo - however can to print around top

Just Send it, Trail names, TMBC etc

Local printer can now layer colour for more complex designs

WB has a print to place on T-Shirts

Possible Rework of TMBC Merch

Use a print on demand company to prudence 5 or so items.

Staple t-shirt, hoodie, stickers

Always in stock on the TMBC website

Have specialty items printed in TBA

Socks

Special t- shirt when a new trail opens

more intricate designs or special event

DC to set up POD samples, WB to follow up with locally produced items

MERCH Sub Committee Messenger Group

Trail Maintenance

Trial a lockable metal chest that moves around Jubilee to the trail that needs it the most

Change combination each week

Has a log book in the chest

Has the basics - snippers, cord, fuel etc.

Paint the chest bright pink

WB and NR to investigate further

Blue Sky maintenance course

South Burnett, Stanthorpe, TRC and TBMC

Dates TBC - However looking at around 3rd and 4th of October

Trail Maintenance for Fox on Rocks

NR to liaise with GC to organise

Interschool MTB

National schools championships cancelled due to COVID

Former Pres Tom Glover begun the initial talks with Chris Tompson (Head of sport at Mt Lofty SHS) of inter school Mountain Biking

DW and CC to meet with CT next week to further discussions

5 schools are currently interested amd TMBC can provide timing gear

All rider will need to secure Aus Cycling membership to participate, which will further boost club membership

UPDATE - September meeting

TMBC Social Engagement

MA suggested that we engage local legends (such as Jared Graves) for a trial side chat/meet and greet with club members.

MA call for sub committee and action

Darren Wilcox (Club Member) suggested Saturday rides/BBQ with 2 x groups of differing levels heading out. Also suggested night rides, which have traditionally been a club favourite.

UPDATE - Social ride issue now sorted out. Auscyling has advised that we can run social rides. DC has drafted up a guide for ride leaders to follow. Confirmation Email from AusCycling starred in the Gmail.

Liability waiver to be investigated (Task completed - Waiver not suitable for club use - as not legally binding) - No longer required, See above.

DC suggested a MTB movie night and BBQ at the start of Spring.

Projector, with high quality audio

camp chairs etc

BBQ and drinks

Amos road trailhead suitable location due to parking, the hut, and container access

DC and DW to form subcommittee and action

UPDATE - Sub committee (DC and DW) have pushed this out to December school holidays. Intending to make the event a larger event and move it to the depression camp.

Alex McGlashan (club member) suggested a huge rider train from top to bottom.

UPDATE - This could now be facilitated as the Social ride issue is now rectified.

Grassy Knoll Container awning

Grassy Knoll container awning idea discussed.

WB has source a water tank

TW has some ideas on awning design 3m x 3m

Ventilation needs to be replaced on container roof - MM

Look into grant funding for awning

TW - design, quote and grant

Membership Email UPDATE

TidyHQ now has all Membership (215) Emails imported and functioning

Auscycling imports lifestyle and Race Memberships

Supporter memberships are inputed manually by DC

Birthdate field holds the expiry date of each supporter membership

DC to Email each supporter 2 months before expiry of Membership as a reminder. (look into automating this process)

MM to look into adding Supporter Members to AusClycling add in.

MTB Level 0 Coaching Course

AusCycling has provision to run a Level 0 course in Toowoomba

2 day course

Early November

8 people (2 from St Mary’s School)

St Mary’s to possibly provide a venue for the theory

TMBC Exec Ride

All committee interested

Date TBC

Upcoming Events

Mark White (White Lightning Events) may schedule an event in the near future to replace the cancelled GE.

FOR locked in for 18th September

GC has formed a sub committee and preparations are well underway

Club Funduro to run in some aspect on the FOR weekend

Regular social rides to be rolled out O/C of FOR.

Fox on Rocks Weekend

1230 18th September

Lonnie Toia to commissaire event

GC to liaise with Lonnie for specifics

Upcoming FOR tasks

Bunting

CC

Source coffee and food van

TMBC to provide food (slow cookers etc)

Social media post for coffee van

Withcott SS P&C - Cake stall

Race Plates

100 on order - 1 - 50 FOR, 51-100 TMBC

$225 - invoice to be paid MM

Medic

Source medical for event

Timing Chips

confirm numbers and organise shipment (Mark White)

Entry Boss

Confirm with company and open registrations - MM

$50 entry fee TBC

Call out for volunteers

Traditionally FOR volunteer support is high

Volunteer coordinator - DW

Sunday Funduro event - 3 races

Depression camp event village

Race Ideas?

Mini downhill / Enduro

XC event

Dads and Daughter/Kids (under 12’s)

Trail features / Trail Loops

Trail features needing attention

Jumps on Viper

Assess and rebuild

Rollers on the top of Rollercat

Very overgrown section of trail

Roller need to be assed and possibly rebuilt

Cheesy/Fries

look at alternate lines within the 10m limit, in order to increase the length of both trails

Extend fries to terminate at the concrete drop

Realign Cheeseburger to omit the tight switch backs near the end, instead taking the trail high and down to the current hyperlink

Hyperlink then to begin/terminate, as a safe two way trail at the fireroad at the anonymous entry.

Interim Petition UPDATE

DW telechat with TRC CR Rebecca Vonhoff

Red Leaf study results early 2022

Recommendation that TMBC members writes letters to TRC showing support for the Masterplan

Intended result is that TMBC are consulted somehow in the development process

Amended Petition to be drafted

Gather signatures at trail heads to demonstrate non TMBC support for MTB in Toowoomba

Post online petition to SEQ Social Media Pages

Gather support from other rider in SEQ who frequent TBA

Grants

TW had a meeting with Tom Glover regarding grants

Not reconciled- Round 2 - 2019

Weed Management - Northface

Lantana and Privet removal

Train in use of chemical sprays - in consultation with TRC

Purchase club equipment

TW reactivated conversation with TRC

Weed Management grant comes up 6 monthly - $5000

We must acuit the outstanding grant before reapplying for a new one

WB asked if external contractors could be used in weed management via grant funding

Possibly look into rolling 5k weed management grant

TMBC need to log volunteer weed management hours at $25 per hour per person (part of the acquittal process)

NR to ensure that volunteer hours logged

FOR grant rolled over to this years event

TMBC has two accounts

Main Account

Saver Account

Successful grant funding get put into savings account

Meeting declared closed at 9:40pm